Product Name | Ballast Water Treatment System | |||
Technical Data | ||||
Product No. | Capacity | Rated Capacity | Power | Dimension |
Μ³/hr | Μ³/hr | kw | mm | |
MPPE105-EL001 | 30-120 | 100 | 2 | 370x380x1400 |
MPPE105-EL002 | 80-250 | 200 | 3.5 | 510x380x1400 |
MPPE105-EL003 | 150-350 | 300 | 5 | 510x380x1735 |
MPPE105-EL004 | 300-550 | 500 | 7 | 569x416x1815 |
MPPE105-EL005 | 350-750 | 600 | 10 | 600x470x1900 |
MPPE105-EL006 | 400-950 | 800 | 13.5 | 620x470x1900 |
MPPE105-EL007 | 600-1200 | 1000 | 17 | 640x570x2100 |
MPPE105-EL008 | 800-1400 | 1200 | 20 | 730x570x2100 |
MPPE105-EL008 | 1000-1700 | 1500 | 25 | 730x620x2200 |
MPPE105-EL009 | 1500-2300 | 2000 | 33.5 | 880x620x2200 |
MPPE105-EL010 | 2000-2800 | 2500 | 42 | 1030x640x2210 |
MPPE105-EL011 | 2200-3500 | 3000 | 50 | 1460x620x2200 |
MPPE105-EL012 | 4500-6500 | 6000 | 100 | 1460x1240x2200 |
MPPE105-EL013 | 6500-10000 | 9000 | 150 | 2060x1280x2210 |
Main Features | ||||
1.Robust design,proven in continous shipboard
use |
||||
2.Easy, automatic operation |
||||
3.Low power consumption |
||||
4.Minimum maintenance |
||||
5.Safe ,no chemical to transport,store or
handle |
||||
6.Compact design |
||||
7.low pressuredrop allows use of existing ballast
pumps |
||||
8.EX-proof standard option |
||||
9.Skid mounted or modular installation |
||||
Component Introduction | ||||
1.Filter |
||||
adopts full auto-back flushing filter,which can realize
the simultaneous operation of filtration and back flush.The filtration precision is
50µm.It can remove organisms larger than 50µm in ballast water to prevent micro
organisms and sediments entering ballast tank |
||||
2.EUT Unit |
||||
EUT Unit is the core of MPPE-FA BWMS.Each single unit has
the treatment capacity from 100-3000Μ³/h.The Unit comprises of two
parts:Electrocatalysis Unit and Ultrasound Unit.The Electrocatalysis Unit is able to produce
large numbers of hydroxyl radicals and other highly active oxidizing substances to kill all
organisms in ballast water within several nanoseconds .The whole sterilization process is
completed inside the EUT Unit.During the treatment process.the Ultrasound Unit can clean the
surface of Electrocatalysis.Unit regularly to keep the long-term treatment effectiveness of
the electrocatalysis material. |
||||
3.Control Unit |
||||
Control Unit is responsible for regulating the entire
system including collectionof various signals from the sensors,Management of alarm signals
and controls of system startup and shutdown.It contains all procedures for the system
operation,displays the system working condition,including the working condition of various
parts as well as data and status reported by real time inspection from various sensors
|